Prof. Dr. Daniel Stockhammer
Professor
Academic Director PhD AR
University
Liechtenstein
Fürst-Franz-Josef-Strasse
9490 Vaduz
Liechtenstein
daniel.stockhammer@uni.li
Advanced Studio Built Heritage and Circularity: ARCHITECTURE IN STORAGE
(Module/Course/Examination)
Advanced Studio Built Heritage and Circularity: ARCHITECTURE IN STORAGE (BSc Thesis)
(Module/Course/Examination)
Advanced Studio Built Heritage and Circularity: ARCHITECTURE IN STORAGE (MSc Thesis)
(Module/Course/Examination)
Advanced Studio Built Heritage and Circularity:
(Project)
Free Master's Thesis: Built Heritage and Circularity
(Module/Course/Examination)
Free Master's Thesis: Built Heritage and Circularity
(Project)
Independent Study: Search for Circularity (BH&C, 2 ECTS)
(Module/Course/Examination)
Independent Study: Search for Circularity (BH&C, 2 ECTS)
(Seminar)
Independent Study: Search for Circularity (BH&C, 3 ECTS)
(Module/Course/Examination)
Independent Study: Search for Circularity (BH&C, 3 ECTS)
(Seminar)
Independent Study: Search for Circularity (BH&C, 4 ECTS)
(Module/Course/Examination)
Independent Study: Search for Circularity (BH&C, 4 ECTS)
(Seminar)
Independent Study: POSTHUM (BH&C, 2 ECTS)
(Module/Course/Examination)
Independent Study: Your Topic, Your Tools (BH&C, 2 ECTS)
(Seminar)
Independent Study: POSTHUM (BH&C, 3 ECTS)
(Module/Course/Examination)
Independent Study: Your Topic, Your Tools (BH&C, 3 ECTS)
(Seminar)
Independent Study: POSTHUM (BH&C, 4 ECTS)
(Module/Course/Examination)
Independent Study: Your Topic, Your Tools (BH&C, 4 ECTS)
(Seminar)
Preliminary Study: Built Heritage and Circularity
(Module/Course/Examination)
Preliminary Study: Built Heritage and Circularity
(Project)
Reusable wooden building blocks. Construction principles since the industrialization of the building industry
FFF-Funding Project
May 2026
until
April 2027
Circular Building Systems: Segmented Construction Approaches à la Philibert de L'Orme Using the Example of the Caserne Rochambeau
PhD-Thesis
since
September 2023
Circular construction with modular building blocks. Potentials of reusability of components from patent applications 1877-1960
FFF-Funding Project
July 2023
until
December 2024
(finished)
Buildings as digital material banks. BIM tools for construction material recovery in planning process and building disassembly.
PhD-Thesis
September 2021
until
April 2026
(finished)
Der wiederverwendbare Ziegel. Konstruktive Prinzipien des zirkulären Bauens in historischen Patentschriften (1860–1960)
PhD-Thesis
September 2021
until
August 2026
(finished)
Renewable Architecture - the Circular Building as a Material Bank and Repository of Knowledge
API-Funding Project
November 2019
until
October 2022
(finished)
Reusing & Upcycling Architecture: Rethinking the way we build things
FFF-Funding Project
November 2018
until
October 2019
(finished)